Irc cladding to roof clearance.
For roofs where pv panels cover up to 33 of the total area in plan view essentially as seen from above the panels must be at least 18 in.
Away from a horizontal ridge on both sides to create the 36 in wide path.
The flat roofing material must go up the wall a minimum of 12 or up the wall and over the top of the wall if the wall is less than 12 high.
Panels and modules installed on dwellings shall not be located less than 3 feet 914 mm below the roof ridge to allow for fire department smoke ventilation operations.
Anchorage shall conform to the requirements in section r1003 4 1.
Masonry and concrete chimneys and foundations in seismic design category d 0 d 1 or d 2 shall be anchored at each floor ceiling or roof line more than 6 feet 1829 mm above grade except where constructed completely within the exterior walls.
Irc carocelle ltd cladding specialists.
Yes even flat roof to wall intersections are not being properly done.
Measure from the edge of the chimney flue closest to the roof horizontally until you touch the roof surface to check the ten foot clearance rule distance.
That s the light blue line in our photo.
Here stone veneer is installed below the surface of the tile roof where freeze thaw cycles are tearing the mortar apart.
Figure 9 4 illustrates a good roof wall flashing detail that is code compliant and includes best practices recommended in this section.