They are not a good choice in any location where there are seasonal wildfire hazards.
Is epoxy a good roofing material.
Saving your old asphalt shingled roof doesn t get any easier or better than this.
Be aware that growing fire hazards in some regions has caused legal restrictions on the use of wood roofing materials.
Armor roof shield is a high performance epoxy rubber roof coating that outperforms traditional roofing materials such as epdm rubber and asphalt materials.
This flexible resilient and elastomeric epoxy roof coating is fully reinforced with a durable stitch bond non woven fabric perfect for all flashing and roofing applications.
Besides the durability its lifespan makes it popular for commercial and industrial use.
See the must read tabs on the product pages for specifications and other important information.
Roof decks are incredibly unique spaces that allow you to transform your roof into an outdoor area that many enjoy.
Simply clean all dirt mold and mildew off stir contents in can then roller on with 1 2 nap roller or use a hand pumped sprayer to apply our roof coating for asphalt shingles.
This means you need to repair defects remove existing coatings clean the floor and then acid etch the surface.
Epoxy will not create a chemical bond with already cured epoxy unless you sand it down first.
They make for an extremely attractive roof but are tricky to install and not suitable for most diyers.
So to summarize when epoxy is used as a roof coating it is effectively cementing any material on the roof.
Preparing the concrete and applying the epoxy.
It also out performs all coatings such as liquid epdm water or silicone based elastomerics.
For a good epoxy covering the concrete must be cured clean unpolished unsealed and patched.
Our epoxy roof coating system is safe to handle and requires no specialized equipment to install.
Think of epoxy as a cross between plaster and cement.
It is designed to hold things in place like plaster does but it is also designed to create very very hard surfaces similar to cement.
There can be few to no chips spalling or pitting.
Let the first coat dry for 3 4 hours and then apply the second coat.
It can still stick to other epoxy but it will definitely not be strong enough for a well created project that will last.
Epoxy coating lasts longer than many types of flooring.